Rua Paraíba, 1465 / 11th Floor. Savassi. Belo Horizonte

prominas

excellence in mining

Boost your mining operations with complete and high performance solutions.

THE prominas offers cutting-edge technology and excellent services to maximize your productivity and profitability.

THE synergy perfect between mining and technology

We integrate technological advancements with mining processes, exponentially increasing operational efficiency within mines. Discover how we can transform your operations!
PROMINAS
CONSULTING

Mining consultancy services from Exploration to Mine Closure.

PROMINAS

MINEPLAN hexagon®

Accurate 3D modeling and powerful data visualization ensure productive mines with fully optimized processes.

PROMINAS
TECH

Technological innovations to offer integrated and customized solutions in mining.

PROMINAS
UNIVERSITY

We develop and deliver advanced development programs to train professionals in the mining sector.

BECAUSE THE

PROMINAS

TECHNOLOGY, EXCELLENCE AND INNOVATION
Cutting-edge solutions with high quality standards and advanced technology.
SUSTAINABILITY AND CITIZENSHIP
We promote sustainable development with balance, seeking to preserve natural resources.
INTEGRITY AND TRANSPARENCY
We respect the principles, policies and procedures defined by the company and regulated by law, ensuring the trust of our customers and partners.
DATA-DRIVEN PERFORMANCE
Our Data Driven culture allows us to achieve high performance, with concrete and thoroughly analyzed information. Ensuring efficiency and exceptional results.

CLIENTS

Meet our long-standing customers who guarantee our mining excellence!
LATEST
articles of the
prominas blog
FOLLOW OUR CONTENT
Sigma - Figura2
28 Feb: D&T Prominas | Sigma – Integration with MP3D

Sigma integration with MP3D: Highlight and visualize data from within Sigma. Did you know that Sigma allows you to highlight data directly in MinePlan 3D? In this Tips & Tricks, we will see how to observe samples that meet a certain criteria using Sigma graphs. To enable integration between Sigma and MP3D, it is necessary to link the MinePlan Drillhole Manager hole Data Source with its respective hole view, called DH View. To do this, when creating the Data Source, you must load the hole view object in the DH View Object field. Note that the object must be open at the time of connection. Figure 1 illustrates this link. Figure 1: Linking a hole view to Sigma. Once the hole view is linked to Sigma, you can select datasets from the…

Backload to Composites - Figura 3
29 Dec: D&T Prominas | Backload to Composites

Backload to Composites: Routine for editing composites with information from a block model. Did you know that MinePlan makes it possible to write information from a block model into a Drillhole Manager database? Using Compass or Logic, it is possible to edit a Drillhole Manager base with information about the blocks where a certain interval of a compound or 3D point is located. The procedure in question can be found by the code p61701.dat or by the name Backload to Composites in Compass (Figure 1) or by the name Load 3-D Block Geologic Codes to Drillholes in Logic (Figure 2). Figure 1: “Backload to Composites” procedure opened in Compass. Figure 2: “Load 3-D Block Geologic Codes to Drillholes” procedure opened in Logic. The procedure works as follows: using the PCF of a project (file *10.dat) as input data,…

mpso_lock_scheduling
22 Dec: D&T Prominas | Lock Scheduling Periods – MinePlan Schedule Optimizer (MPSO)

Lock Scheduling Periods – MinePlan Schedule Optimizer (MPSO): Agility and efficiency in editing project configurations. Did you know that MinePlan Schedule Optimizer presents, from its most recent version, MPSO 13.20-00, an option that makes it possible to lock periods already sequenced, allowing the user to make edits without losing the sequencing of these periods? Previously, when making edits in Process Flow, such as changing the reservation logic, or adding and removing cuts, the sequencing was restarted after applying, thus losing the results already obtained. According to the amount of data, recalculating the sequencing could take a long time to achieve the result again. With a view to improving the user experience, saving time and avoiding rework, the Lock Schedule Periods option allows the user to lock the sequencing results until the desired period, which allows the necessary edits to be made…

en_US
Contact us!