prominas
excellence in mining
Boost your mining operations with complete and high performance solutions.
THE prominas offers cutting-edge technology and excellent services to maximize your productivity and profitability.
THE synergy perfect between mining and technology
CONSULTING
Mining consultancy services from Exploration to Mine Closure.
MINEPLAN hexagon®
Accurate 3D modeling and powerful data visualization ensure productive mines with fully optimized processes.
TECH
Technological innovations to offer integrated and customized solutions in mining.
We develop and deliver advanced development programs to train professionals in the mining sector.
BECAUSE THE
PROMINAS
CLIENTS
MPReserves – Covering between topographies: Practicality to carry out the cubing between two topographies. Did you know that MinePlan has a tool that calculates reserves between two surfaces? With the MPReserves tool, which has its own menu, the user can select two topographies so that the calculation of reserves is carried out using information from the Block Model. Accessing the “Setup Reserves” option, located in the Reserves menu, navigate to the Surface Cuts tab and select the topographies of interest using the Add Surface Cut(s) option. Afterwards, you must specify the position of the topographies in the “Position” column. In addition, in “Surface Name”, the user can change the name of the surfaces, thus customizing the visualization of the results. Figure 1: Surface Cuts tab – MPReserves. Using the Calculate Reserves option, the tool will measure the topographies, generating a dynamic table…
MPSO Block Schedule Coding: Encode the result of Mining Sequencing in the block model. Did you know that MinePlan Schedule Optimizer (MPSO) has an option that allows the user to easily stamp results into the Block Model? The Block Schedule Coding option, located in the Utilities menu, makes it possible to stamp Block Model items with the sequenced periods and destinations to which the materials were sent. After accessing the option, you can, in a simple way, configure the Destinations tab, through the Code column, inserting the desired numeric code that each destination will represent in the Block Model. In the Destination Item option, you must specify the model item into which the values will be encoded. Figure 1: Destinations tab in Block Schedule Coding – MPSO. In the Periods tab, you can specify in the Period Item column the variable of…
MinePlan Activity Scheduler – Truck Leveling: Practicality in leveling the number of trucks. Did you know that MinePlan Activity Scheduler has a tool that automatically levels the number of transport equipment when distributing material? Short-term planning is one of the main channels of communication between planning and mine operations. The Truck Leveling Tool allows the user to optimize material movement based on the schedule and limit truck over-utilization, automatically reducing excavator productivity. This helps to eliminate equipment overuse and create an effective schedule in a short amount of time, allowing you to analyze and adjust the number of equipment in the fleet to ensure that the target is achieved. To use this tool, click on the Truck Leveling Configuration option located in the Project panel. The tool…