MPSO Block Schedule Coding: Encode the result of Mining Sequencing in the block model.
Did you know that the MinePlan Schedule Optimizer (MPSO) has an option that allows the user to easily stamp the results into the Block Model?
The option Block Schedule Coding, located in the menu Utilities, makes it possible to stamp Block Model items with the sequenced periods and destinations to which the materials were sent.
After accessing the option, you can, in a simple way, configure the tab Destinations, through the column Code, inserting the desired numerical code that each destination will represent in the Block Model. in the option Destination Item, you must specify the model item into which the values will be encoded.
Figure 1: Destinations tab in Block Schedule Coding – MPSO.
on the tab periods, you can specify in the column PeriodItem the model variable that will receive the values of the sequenced periods.
Figure 2: Period Item tab in Block Schedule Coding – MPSO.
After performing the configuration, use the option run for the tool to write the values of the selected variables. It is worth mentioning that each option of this tool is independent, that is, if the user wants to stamp only destinations or periods, just leave the option enabled update in the corresponding tab.
In the following video, you can see the use of the option Block Schedule Coding: https://youtu.be/cpZti29YZhM
Wassup, did you like this tip? For more information about the option Block Schedule Coding of MPSO, in addition of other functions of MinePlan, contact our team and we will be happy to serve you.
To the next!!!